R&D & Quality

R&D AND QUALITY ASSURANCE

Comprehensive Testing Laboratory

Covering electrical, environmental, functional, and dimensional testing domains to ensure products meet automotive-grade quality requirements

Electrical Testing

Overvoltage TestReverse Polarity TestShort/Open Circuit TestInsulation TestWithstand Voltage TestLCR TestDi/Dt Test6.5 Digit DMMOscilloscope

Environmental Testing

High/Low Temp Oil TestSalt Spray TestThermal Shock TestHigh/Low Temp TestTemperature & Humidity TestRapid Temp Change Test

Functional Testing

Current Sensor Functional TestEddy Current & Linear Displacement Sensor TestHIL Consistency Automated TestEPS Functional TestGear Sensor Functional Test

Dimensional / Appearance

CMMProjectorX-RAY

ASPICE Level2 Certified Development System

ASPICE Level2 certification establishes a compliant and standardized technical foundation, building a full-process standardized development management from requirements analysis to test verification.

ASPICE Level2Certified
VDA6.3Process Audit
100%Independent
01
Requirements
02
Architecture
03
Detailed Design
04
Implementation
05
Unit Testing
06
Integration Testing
07
System Testing
08
Production

MES Manufacturing System

Covering SMT and assembly workshops, achieving full-process digital manufacturing control through ERP integration

SMT Workshop
Assembly Workshop
ERP System

Scheduling

Sync ERP work orders, complete order decomposition and dispatch

TPM Management

Equipment/tool status monitoring and preventive maintenance

Warehouse

Fine-grained material management and optimized inventory

Materials

Unique barcode management at minimum package level

Equipment Connect

Comprehensive process information tracking and analysis

Lean Management

Low-level material alerts, JIT pull production system

Error-proofing

Precise real-time management of every product

Visualization

Intuitive shop floor dashboards and reports

ERP Integration

Breaking information silos, enabling real-time data exchange

Personnel

Quantifiable personnel skill and performance management

Exception Mgmt

Instant identification and reporting of equipment, order, and material exceptions

Central Control

Remote monitoring and closed-loop exception management

Full-Process Production Control

STEP 01Receiving
STEP 02IQC Inspection
STEP 03Warehousing
STEP 04Work Order
STEP 05Material Feed
STEP 06Process Control
STEP 07Quality Check
STEP 08Delivery

Scaled Flexible Production for Full Controller & Sensor Portfolio

Multi-site coordination across Wuhan, Wuhu, and Xianning — automated production lines with digital MES delivering high-quality at scale

SMT Lines

4M / year
3 SMT lines
01QR Laser Marking02Printing03SPI04Pick & Place05Pre-AOI06N2 Reflow07Post 3D AOI08ICT

Controller Assembly

4M / year
3 controller assembly lines
01PCB Depanel02Programming03Conformal Coating04Curing05Assembly06EOL Electrical Test

Current Sensor Lines

5M units / year
12 current sensor lines
01Lead Trim02Selective Wave Solder03AOI / Depanel04Press-Fit05Resin Pot & Cure06Housing Injection07HiPot Insulation08Calibration & Test

Eddy-Current Lines

2M units / year
5 eddy-current sensor lines
01Twisting & Sleeving02Strip / Crimp / Tinning03Selective Wave Solder04Press-Fit05Housing & Hot Riveting06Resin Pot & Cure07Programming & Test

Position Sensor Lines

1M units / year
2 position sensor lines
01Sub-part Injection02Depanel & Press-fit03Welding & Hot Riveting04Air-tightness Test05Laser Welding06Calibration & Test

Massage Bladder Line

Premium cockpit
Cockpit massage line
01Air-tight Test02Tube Insertion03Lumbar Load Test04Bladder Load05Lumbar Air-tight06Noise Test07Bladder/Massage Air-tight Test